Engineering, 11.03.2020 03:30 annamariaafowyhrq
Saturated water vapor leaves a steam turbine at a flow rate of 1.5 kg/s and a pressure of 0.51 bar. The vapor is to be completely condensed to a saturated liquid in a shell-and-tube heat exchanger that uses city water as the cold fluid. The water enters the thin-walled tubes at 17°C and is to leave at 57°C.
1. Assuming an overall heat transfer coefficient of 2000W/m^2*K, determine the required heat exchanger surface area and the water flow rate.
After extended operation, fouling causes the overall heat transfer coefficient to decrease to 1000W/m^2*K, and to completely condense the vapor, there must be an attendant reduction in the vapor flow rate.
2. For the same water inlet temperature and flow rate, what is the new vapor flow rate required for complete condensation?
Answers: 3
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
Engineering, 04.07.2019 18:10, oliviasoreo92
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
Engineering, 04.07.2019 18:10, tobyhollingsworth178
Which from the following instrument is commonly used to detect the high pitch butzing sound in bearings? [clo4] a)-digital ultrasonic meter b)-infrared camera c)-spectroscopic d)-vibrometer
Answers: 2
Saturated water vapor leaves a steam turbine at a flow rate of 1.5 kg/s and a pressure of 0.51 bar....
Computers and Technology, 07.07.2021 03:40
Mathematics, 07.07.2021 03:40