Engineering, 10.03.2020 00:56 iBrain
As a part of major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per 8-hour day. The task times and precedence relationships are as follows: Task Duration (minutes) Precedes Task A 0.2 B B 0.4 C C 0.2 F D 0.4 E E 1.2 G F 1.2 G G 1.0 end What is the idle time on station 2? (Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.)
Answers: 1
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
Engineering, 04.07.2019 18:20, luisgonz5050
Find the kinematic pressure of 160kpa. for air, r-287 j/ kg k. and hair al viscosity of air at a temperature of 50°c and an absolute (10 points) (b) find the dynamic viscosity of air at 110 °c. sutherland constant for air is 111k
Answers: 3
As a part of major plant renovation project, the industrial engineering department has been asked to...
Chemistry, 07.09.2019 06:10
Social Studies, 07.09.2019 06:10
Mathematics, 07.09.2019 06:10
Computers and Technology, 07.09.2019 06:10
Mathematics, 07.09.2019 06:10