As a part of major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per 8-hour day. The task times and precedence relationships are as follows: Task Duration (minutes) Precedes Task A 0.2 B B 0.4 C C 0.2 F D 0.4 E E 1.2 G F 1.2 G G 1.0 end What is the idle time on station 2? (Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.)

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
You know the right answer?
As a part of major plant renovation project, the industrial engineering department has been asked to...

Questions in other subjects:

Konu
World Languages, 08.01.2021 14:40
Konu
History, 08.01.2021 14:40