Engineering, 10.03.2020 00:56 iBrain
As a part of major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per 8-hour day. The task times and precedence relationships are as follows: Task Duration (minutes) Precedes Task A 0.2 B B 0.4 C C 0.2 F D 0.4 E E 1.2 G F 1.2 G G 1.0 end What is the idle time on station 2? (Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice.)
Answers: 1
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
As a part of major plant renovation project, the industrial engineering department has been asked to...
Computers and Technology, 08.01.2021 14:40
English, 08.01.2021 14:40
World Languages, 08.01.2021 14:40
History, 08.01.2021 14:40
Mathematics, 08.01.2021 14:40