Why might construction crews want to install pipes before the foundation is poured
A. Pipes form an important component of the structural integrity of a foundation.
B. All utilities, including electrical and HVAC, are installed before the foundation is laid.
C. Plumbing must feed into municipal water and sewer lines buried below the foundation.
D. Plumbing crews are more expensive than concrete masons; therefore it is cheaper if they do their work first.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, brooklyn674
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
image
Engineering, 04.07.2019 18:10, mamasbug4285
An air compression refrigeration system is to have an air pressure of 100 psia in the brine tank and an allowable air temperature increase of 60°f for standard vapor compression cycle temperatures of 77 f entering the expansion cylinder and 14 f entering the compression cylinder, calculate the coefficient of performance a. 2.5 b 3.3 c. 4.0 d. 5.0
Answers: 3
image
Engineering, 04.07.2019 19:10, kelseiroll9759
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
image
Engineering, 04.07.2019 19:20, littlepotato10
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
You know the right answer?
Why might construction crews want to install pipes before the foundation is poured
A. Pipes fo...

Questions in other subjects:

Konu
English, 30.08.2019 22:10
Konu
Advanced Placement (AP), 30.08.2019 22:10