subject
Engineering, 03.03.2020 17:03 majakvcvc77

Assignment Details
As a new engineer for a traffic congestion mitigation company, you have been tasked with developing a Java Swing GUI that displays time, traffic signals and other information for traffic analysts. The final GUI design is up to you but should include viewing ports/panels to display the following components of the simulation:
1. Current time stamps in 1 second intervals
2. Real-time Traffic light display for three major intersections
3. X, Y positions and speed of up to 3 cars as they traverse each of the 3 intersections
Some of the details of the simulation are up to you but the following guidelines will set the guardrails:
1. The components listed above should run in separate threads.
2. Loop through the simulation with button(s) providing the ability to start, pause, stop and continue the simulation.
3. You will need to use basic distance formulas such as distance = Speed * time. Be sure to be
consistent and define your units of measure (e. g. mile/hour, versus km/hour)
4. Assume a straight distance between each traffic light of 1000 meters.
5. Since you are traveling a straight line, you can assume Y = 0 for your X, Y positions.
6. Provide the ability to add more cars and intersections to the simulation through the GUI.
7. Don’t worry about physics. Assume cars will stop on a dime for red lights, and continue through
yellow lights and green lights.
8. Document all assumptions and limitations of your simulation.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, bunnles
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Assignment Details
As a new engineer for a traffic congestion mitigation company, you have bee...

Questions in other subjects:

Konu
Mathematics, 11.07.2019 14:00