subject
Engineering, 03.03.2020 05:01 desiree3114

Before entering an underground utility vault to do repairs, a work crew analyzed the gas in the vault and found that it contained 29 mg/m3of hydrogen sulfide. Because the allowable exposure level is 14 mg/m3, the work crew began ventilating the vault with a blower. If the volume of the vault is 160 m3and the flow rate of contaminant-free air is 10 m3/min, how long will it take to lower the hydrogen sulfide level to a level that will allow the work crew to enter? Assume the manhole behaves as a CMFR and that hydrogen sulfide is nonreactive in the time period considered.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 19:30, 10040813
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
You know the right answer?
Before entering an underground utility vault to do repairs, a work crew analyzed the gas in the vaul...

Questions in other subjects: