subject
Engineering, 03.03.2020 00:29 18080980

An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at the approach at the rate of 800 veh/h. The approach is controlled by a pre-timed signal with a cycle length of 60 seconds and D/D/1 queuing holds. Local standards dictate that signals should be set such that all approach queues dissipate 10 seconds before the end of effective green portion of the cycle. Assuming that approach capacity exceeds arrivals, determine the maximum length of effective red that will satisfy the local standards.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:20, karatsgrande3772
Determine the damped natural frequencies and the steady state response of a decoupled damped forced two degrees of freedom system. 10ä1 + 2q1 20q1 10 cos t; 10q2 +4q2 + 40q2 10 cos t
Answers: 3
image
Engineering, 04.07.2019 18:20, dlr1628
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
You know the right answer?
An intersection approach has a saturation flow rate of 1500 veh/h, and vehicle arrive at the approac...

Questions in other subjects:

Konu
Mathematics, 20.04.2021 07:10
Konu
English, 20.04.2021 07:10