You operate a small wooden toy company making two products – alphabet blocks and wooden trucks.
Your profit is $30 per box of blocks and $40 per box of trucks.
The production a box of blocks requires 1 hour of woodworking and 2 hours of painting.
The production of a box of trucks requires 3 hours of woodworking and 1 hour of painting.
You employ 3 woodworkers and 2 painters – each working 40 hours per week.
Use linear programming to determine how many boxes of blocks and how many boxes of trucks you would make each week to maximise profit.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
image
Engineering, 04.07.2019 18:20, rhussein6452
Wiy doeres rere okhn a pump whon working betwon the same pressure range?