Engineering, 24.02.2020 19:32 jackandryansis8572
A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction project involves a major realignment of the highway such that a 60mi/h design speed is attained. at one point on the highway, a 720 ft equal-tangent crest vertical curve exists. measurements show that at 3+40 stations from the PVC, the vertical curve offset is 3.5 ft. assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and if the existing curve is inadequate, compute a satisfactory curve length.
Answers: 1
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3