subject
Engineering, 17.02.2020 17:59 aubrey1161

Two rectangular sedimentation basins, each 15 m feet long, 4 m wide and 3 m deep, settle 4200 m3 /d in a primary system. The effluent weir length is 18 m. Calculate (a) the detention time, (b) the overflow rate, (c) the critical settling velocity, and (d) the flow rate over the effluent weir

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 18:20, 1230bering
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
You know the right answer?
Two rectangular sedimentation basins, each 15 m feet long, 4 m wide and 3 m deep, settle 4200 m3 /d...

Questions in other subjects:

Konu
Biology, 16.05.2021 04:10
Konu
Mathematics, 16.05.2021 04:10