Two rectangular sedimentation basins, each 15 m feet long, 4 m wide and 3 m deep, settle 4200 m3 /d in a primary system. The effluent weir length is 18 m. Calculate (a) the detention time, (b) the overflow rate, (c) the critical settling velocity, and (d) the flow rate over the effluent weir
Answers: 3
Engineering, 04.07.2019 18:10, Strick1530
Which of the following components of a pid controlled accumulates the error over time and responds to system error after the error has been accumulated? a)- proportional b)- derivative c)- integral d)- on/off.
Answers: 2
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
Engineering, 04.07.2019 18:20, 1230bering
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
Two rectangular sedimentation basins, each 15 m feet long, 4 m wide and 3 m deep, settle 4200 m3 /d...