subject
Engineering, 14.02.2020 20:33 herchellann302

A metal specimen with an original diameter of 0.50 in. and a gauge length of 2.75 in. is tested in tension until a fracture occurs. At the point of fracture, the diameter of the specimen is 0.30 in. and the fractured gage length is 4.20 in. Calculate the ductility in terms of percent elongation and percent reduction in area.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 04.07.2019 18:10, yasminothman02
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
image
Engineering, 06.07.2019 04:10, nickmoose04
Aheat pump with refrigerant-134a as the working fluid is used to keep a space at 25°c by absorbing heat from geothermal water that enters the evaporator at 500c at a rate of 0.065 kg/s and leaves at 40°c. the refrigerant enters the evaporator at 20°c with a quality of 23 percent and leaves at the inlet pressure as saturated vapor. the refrigerant loses 300 w of heat to the surroundings as it flows through the compressor and the refrigerant leaves the compressor at 1.4 mpa at the same entropy as the inlet. determine: (a) the degrees of subcooling of the refrigerant in the condenser, b)-the mass flow rate of the refrigerant . (c) the heating load and the cop of the pump, and d)-the theoretical minimum power input to the compressor for the same heating load.
Answers: 3
image
Engineering, 06.07.2019 05:10, squawk1738
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
You know the right answer?
A metal specimen with an original diameter of 0.50 in. and a gauge length of 2.75 in. is tested in t...

Questions in other subjects: