A plastic molding machine produces a product whose annual demand is in the millions.
The machine is automated and used full time just for the production of this product. The
molding cycle time = 45 sec. No tooling is required other than the mold, which cost
$100,000 and is expected to produce 1,000,000 moldings (products). The plastic molding
compound costs $1.20/lb. Each molding weighs 0.88 lb. The only labor required is for a
worker to periodically retrieve the moldings. Labor rate of the worker = $18.00/hr
including overhead. However, the worker also tends other machines and only spends 20%
of his time on this machine. Setup can be ignored because of the long production run. The
molding machine was purchased for $500,000 installed, its anticipated life = 10 years,
and it operates 6000 hours per year. Equipment overhead rate = 30%. Assume availability
= 100% and scrap rate = 0. Determine (a) the hourly production rate of the machine, (b)annual quantity of product molded, and (c) cost per piece.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, cowgyrlup124
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 18:10, oliviasoreo92
Compute the pressure drop of 30°c air flowing with a mean velocity of 8 m/s in a circular sheet-metal duct 300 mm in diameter and 15 m long. use a friction factor, f 0.02, and pair = 1.1644 kg/m a. 37.26 pa b. 25.27 pa n c. 29.34 pa d. 30.52 pa
Answers: 1
You know the right answer?
A plastic molding machine produces a product whose annual demand is in the millions.
The machi...

Questions in other subjects: