subject
Engineering, 13.02.2020 20:13 davia97

The composite wall of an oven consists of three materials, two of which are of known thermal conductivity, kA = 25 W/m ⋅ K and kC = 60 W/m ⋅ K, and known thickness, LA = 0.40 m and LC = 0.20 m. The third material, B, which is sandwiched between materials A and C, is of known thickness, LB = 0.20 m, but unknown thermal conductivity kB. Under steady-state operating conditions, measurementsreveal an outer surface temperature of Ts, o =20ºC, an inner surface temperature of Ts, i= 600ºC, and an oven air temperature ofT¥=800ºC. The inside convection coefficienth is known to be 25 W/(m^2•K). What isthe value of kB?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:20, mjcbs21
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
image
Engineering, 04.07.2019 19:10, Lexi5170
A)-explain briefly the importance of standards in engineering design. b)- what is patent? c)-explain the relationship between these standards: b. s. and b. s.en d)- in engineering design concepts, types of loads and how they act are important factors. explain.
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The composite wall of an oven consists of three materials, two of which are of known thermal conduct...

Questions in other subjects:

Konu
Spanish, 30.11.2020 22:10