William, a project manager, needs to prepare the budget for a new software development project. To do so, he takes inputs from other managers who have worked orn similar projects in the past. After estimating the overall project cost, he gives the estimates to his team members so that they car split up the cost of each individual task involved in producing the required deliverable. In this scenario, William is using:.
a. top-down budgeting
b. bittom-up budgeting
c. agile project budgeting
d. dynamic matrix budgeting

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, redrosesxx
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
image
Engineering, 04.07.2019 18:10, soreese02
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
image
Engineering, 04.07.2019 18:10, genyjoannerubiera
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
You know the right answer?
William, a project manager, needs to prepare the budget for a new software development project. To d...

Questions in other subjects:

Konu
Geography, 05.02.2020 09:51
Konu
Social Studies, 05.02.2020 09:51