subject
Engineering, 06.01.2020 21:31 uchechukwueigwe

Jose owns jose’s taqueria and needs to know how to allocate tips for his servers. which of the following best describes how jose should calculate allocated tips
sumar todas las propinas de todos los empleados por la venta de comida y bebidas, menos el 10% por cargo deservicio / add all the employee’s reported tips on food and drink sales, minus 10% service chargesumar todas las propinas de todos los empleados de ventas de comida y bebidas / add all the employee’s reported tips on food and drink salessumar todas las propinas de todos los empleados de venta de comida y bebidas e incluyendo las ventas hechaspara llevar a casa / add all the employee’s reported tips on food and drink sales, including carryout salessumar todas las propinas que recibieron todos los empleados, de venta de comida y bebidas e incluso las ventas de alimentos para llevar, menos el 10% por cargo del servicio / add all the employee’s reported tips on food and drink sales, including carryout sales, minus 10% service charge

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niicoleassssssf
Aflywheel accelerates for 5 seconds at 2 rad/s2 from a speed of 20 rpm. determine the total number of revolutions of the flywheel during the period of its acceleration. a.5.65 b.8.43 c. 723 d.6.86
Answers: 2
image
Engineering, 04.07.2019 18:10, bckyanne3
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Jose owns jose’s taqueria and needs to know how to allocate tips for his servers. which of the follo...

Questions in other subjects: