Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. each kanban holds 8 computers. what is the correct number of kanbans?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, meganwintergirl
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
image
Engineering, 04.07.2019 19:10, Destinationz
Asteam is contained in a rigid tank with a volume of 1 m3. initially, the pressure and temperature are 7 bar and 500 oc, respectively. the temperature drops due to cooling process. determine: (1) the temperature at which condensation begins in °c, (2) the fraction of the total mass that has condensed when the pressure decreased to 0.5 bar. (3) the volume in m3 occupied by saturated liquid at the final state?
Answers: 3
image
Engineering, 06.07.2019 05:10, IanMH
Does the hardness of a sheet metal have an effect on its springback in bending? explain.
Answers: 1
image
Engineering, 06.07.2019 05:20, cravens511peeelg
Asteam engine isentropically expands 5 kg/sec of steam from 0.7 mpa, 220°c, the exhaust is dry and saturated. determine (the work of nonflow process (b) the final temperature, and (c) the work of a steady flow process
Answers: 3
You know the right answer?
Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day. each...

Questions in other subjects: