Engineering, 21.12.2019 01:31 nayellisoto15
Aconsulting firm submitted a bid for a large research project. the firm's management initially felt there was a 50/50 chance of getting the bid. however, the agency to which the bid was submitted subsequently requested additional information on the bid. experience indicates that on 75% of the successful bids and 40% of the unsuccessful bids the agency requested additional information. if required, round your answers to two decimal places.1. what is the prior probability of the bid being successful (that is, prior to the request for additional information)? 2. what is the conditional probability of a request for additional information given that the bid will ultimately be successful? 3. compute the posterior probability that the bid will be successful given a request for additional information (to 2 decimals).
Answers: 3
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
Aconsulting firm submitted a bid for a large research project. the firm's management initially felt...
Mathematics, 06.03.2020 01:57
Mathematics, 06.03.2020 01:58