A120-cy/hr maximum output pump is used to place the concrete for a 200-cy slab. the concrete is supplied by 8-cy transit-mix trucks arriving at the site in 12-min intervals. the concrete batch plant is located 5 miles from the site. average truck speed is 30 mph. each transit-mix truck takes, on average, 10 min to discharge. the placement crew size is seven workers. average worker output is 5 cy of concrete per hr. if additional trucks are added the time to place the concrete will decrease

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
image
Engineering, 04.07.2019 18:10, jojoangelique13
The flow rate of air through a through a pipe is 0.02 m5/s. a pitot static tube is placed in the flow. the radius of the pitot static tube is 1 mm. assuming the flow to be steady and the air to be at 300k, calculate the difference in total and static pressure if the diameter of the pipe is: (a) d 0.1 m d 0.05 m (c) d 0.01 m
Answers: 2
image
Engineering, 04.07.2019 18:20, CelesteN64
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
image
Engineering, 04.07.2019 18:20, jessie8022
Apiston-cylinder device contains 0.1 m3 of liquid water and 0.9 m3 of water vapor in equilibrium at 800 kpa. heat is transferred at constant pressure until the temperature of water reaches 350 °c. determine (a) the quality of water at the initial state (b) the work associated with this process, (c) the heat associated with this process.
Answers: 2
You know the right answer?
A120-cy/hr maximum output pump is used to place the concrete for a 200-cy slab. the concrete is supp...