Engineering, 16.12.2019 19:31 kukisbae

Rough riders inc. manufactures jeans in the cutting and sewing process. jeans are manufactured in 50-jean batch sizes. the cutting time is 6 minutes per jean. the sewing time is 15 minutes per jean. it takes 5 minutes to move a batch of jeans from cutting to sewing.

a. compute the value-added, non-value-added, and total lead time of this process.

b. compute the value-added ratio. round to one decimal place.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, winterblanco
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
image
Engineering, 04.07.2019 18:10, wyattlb97
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
image
Engineering, 04.07.2019 18:10, mirmir62
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
Rough riders inc. manufactures jeans in the cutting and sewing process. jeans are manufactured in 50...

Questions in other subjects: