Engineering, 09.12.2019 19:31 tylorroundy

Determine the volume of three identical activated-sludge tanks following primary clarification to aerate 36,000 nv3/d witha bod concentration of 180 mg/l at a bod loading of 560 g/m3 0 d. what is the aeration time? for an fl m of 035. whatmlss concentration should be maintained in the aeration tanks? estimate the operating sludge age, assuming an effluentsuspended solids of 30 mg/l and the daily amount of waste-activated sludge solids from figure 13.1. if the waste sludgehas a concentration of 10.000 mg/l, what is the calculated volume of sludge to be wasted each day? determine thedimensions of three identical rectangular clarifiers (length. width, and side-water depth) with a 21 length-to-width ratio.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, qwertylol12345
Different types of steels contain different elements that alter the characteristics of the steel. for each of the following elements, explain what the element does when alloyed with steel.
Answers: 2
image
Engineering, 04.07.2019 18:10, agpraga23ovv65c
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
You know the right answer?
Determine the volume of three identical activated-sludge tanks following primary clarification to ae...

Questions in other subjects:

Konu
Physics, 16.04.2021 15:20
Konu
Mathematics, 16.04.2021 15:20