Engineering, 04.12.2019 03:31 ssophiaa
Your team has been asked to identify the various possible approaches that might achieve a solution. each approach may have potential for failures. which tool would your team use to determine the optimal approach?
Answers: 3
Engineering, 04.07.2019 18:10, jesuslovesusall3
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
Your team has been asked to identify the various possible approaches that might achieve a solution....
History, 18.03.2021 04:10
English, 18.03.2021 04:10
Mathematics, 18.03.2021 04:10
Mathematics, 18.03.2021 04:10
Biology, 18.03.2021 04:10
Mathematics, 18.03.2021 04:10
Mathematics, 18.03.2021 04:10