Engineering, 28.11.2019 06:31 samm2002
One or more parties may terminate an agency relationship by placing into the agreement a time period for termination. when that time , the agency ends. in addition, the parties can specify that the agency is for a particular . once that is achieved, the agency ends. alternatively, the parties can include a specific event as a trigger for termination; once that event , the agency ends. the parties can terminate an agency relationship prior to any of the preceding events by agreement, or revocation by individual party. g
Answers: 1
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10, ahmedeldyame
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
One or more parties may terminate an agency relationship by placing into the agreement a time period...
Biology, 05.07.2019 12:00
Social Studies, 05.07.2019 12:00
History, 05.07.2019 12:00
Mathematics, 05.07.2019 12:00
Spanish, 05.07.2019 12:00