subject
Engineering, 28.11.2019 04:31 tavito968

Bob owns a gold watch. he asks ray to take it to ray's house and keep it safe for him. bob then secretly removes the watch from ray's house so that he can claim it was lost and file an insurance claim. in some jurisdictions bob has committed larceny. bob has stolen his own watch. that ring that bob received is:

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
image
Engineering, 04.07.2019 18:20, 3076850
Prove the equivalence between the two statements of the 2nd law of thermodynamics (i. e., a violation of one statement leads to the violatio the other statement)
Answers: 2
image
Engineering, 04.07.2019 19:10, kimmy6973
What is creep? what is stress relaxation?
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Bob owns a gold watch. he asks ray to take it to ray's house and keep it safe for him. bob then secr...

Questions in other subjects:

Konu
English, 15.04.2020 02:46