subject
Engineering, 28.11.2019 03:31 joshblubaugh

The project site will require clearing and grubbing prior to beginning earthwork operations. to select the appropriate dozer, the following should be considered: - there are both 335-hp and 460-hp dozers available - the site to be cleared is 75’ wide by 3/4 of a mile long. - the site is generally level and poses no traction problems for the equipment. - 60% of the trees are pines, 40% are oak - the total number of trees per acre is about 300; of those: - 140 trees per acre are 1 to 2 ft in diameter - 50 trees per acre are 2 to 3 ft in diameter. - 35 trees per acre are 3 to 4 ft in diameter. - the current plan is to clear and grub in one operation, and then follow with piling-up in windrows and burning. part 1 - identify which dozer, or combination of dozers, provides the best production rate.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, volleyballfun24
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
image
Engineering, 04.07.2019 18:10, tjeffers90028
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
image
Engineering, 04.07.2019 18:10, selenamr
Ifa component is made of two or more materials with different modulus of elasticity (e), it is called a composite member and we calculate the factor·n". mention the formula for calculating n". also, ifn> 1, explain what will happen to the 1. transformed. gi) ifn 1, what will happen to the material when transformed material when
Answers: 1
You know the right answer?
The project site will require clearing and grubbing prior to beginning earthwork operations. to sele...

Questions in other subjects: