subject
Engineering, 26.11.2019 21:31 KeyesRaveen

The wastewater treatment plant for pine city discharges 1 × 105 m3 /day of treated waste to the pine river.
immediately upstream of the treatment plant, the pine river has an ultimate cbod of 2 mg/l and a flow of 9 × 105 m3 /day.
at a distance of 20 km downstream of the treatment plant, the pine river has an ultimate cbod of 10 mg/l.
the state’s department of environmental quality (deq) has set an ultimate cbod discharge limit for the treatment plant of 2,000 kg/day. the river has a velocity of 20 km/day. the cbod decay coefficient is 0.1/day.

is the plant in violation of the deq discharge limit?

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, colin774
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:20, kendrawalraven
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
image
Engineering, 04.07.2019 19:10, nani3906
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
image
Engineering, 04.07.2019 19:20, ameliaxbowen7
List 3 options on how to reduce knocking problens during engine process,
Answers: 2
You know the right answer?
The wastewater treatment plant for pine city discharges 1 × 105 m3 /day of treated waste to the pine...

Questions in other subjects: