The project require hauling materials to or from the site. the following equipment is available for earthwork operations: one 5-cy heaped capacity bucket loader; a 0.5 min cycle time; 90% fill capacity one 7-cy heaped capacity bucket loader; a 0.6 min cycle time; 90% fill capacity 459-cy heaped capacity off-road trucks; a 0.5 min dump time: 100% fil capacity. loaded trucks travel through the following three sections: haul route distance grade spd speed loaded empty (mph) section 2750 700 1800 10 42 42 42 10 a. calculate the following number of cycles per loader to fill each truck number of trucks required for each loader based on the number of trucks you determine, develop a curve for the s/cy production cost vs. trucks for a range of +2 trucks. use the following hourly rates (including operator) for each piece of equipment: 6-cy capacity loader $105.00/hr 7-cy capacity loader $110.00/hr 49.5-cy off-road truck $120.00 b. determine the total time required to import/export the required materials

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
image
Engineering, 04.07.2019 18:10, nandalabella06
True or false (explain) (110)[111] is a slip system in bcc metals . the {111} family in fcc contains 8 planes. resolved shear stress (rss) in single crystals is just related to the applied stress. critical resolved shear stress (crss) in single crystal metals is direct proportional to the number of defects in the structure
Answers: 2
image
Engineering, 04.07.2019 18:10, wyattlb97
Water at the rate of 1 kg/s is forced through a tube with a 2.5 cm inner diameter. the inlet water temperature is 15°c, and the outlet water temperature is 50°c. the tube wall temperature is 14°c higher than the local water temperature all along the length of the tube. what is the length of the tube?
Answers: 3
image
Engineering, 04.07.2019 18:10, mirmir62
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
The project require hauling materials to or from the site. the following equipment is available for...

Questions in other subjects:

Konu
Biology, 08.03.2021 04:00
Konu
Spanish, 08.03.2021 04:00
Konu
French, 08.03.2021 04:00
Konu
Chemistry, 08.03.2021 04:00
Konu
Mathematics, 08.03.2021 04:00