Engineering, 25.11.2019 22:31 yanicas
Mark pipeline stages that do not perform useful work. how often while the pipeline is full do we have a cycle in which all five pipeline stages are doing useful work? (begin with the cycle during which the subi is in the if stage. end with the cycle during which the cbnz is in the if stage.)
Answers: 1
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
Engineering, 04.07.2019 18:10, ayoismeisjjjjuan
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
Mark pipeline stages that do not perform useful work. how often while the pipeline is full do we hav...
Mathematics, 24.08.2020 22:01
Mathematics, 24.08.2020 22:01
English, 24.08.2020 22:01
History, 24.08.2020 22:01
History, 24.08.2020 22:01
Mathematics, 24.08.2020 22:01