subject
Engineering, 21.11.2019 03:31 pipo5699

Anon-pipelined system takes 100ns to process a task. the same task can be processed in a 5-segment pipeline with a clock cycle of 20ns.

a. determine the speedup ratio of the pipeline for 100 tasks.

b. determine the speedup ratio of the pipeline for 20 tasks.

c. determine the speedup ratio of the pipeline for 1 task.

d. what is the maximum speedup that could be achieved with the pipeline unit over the non-pipelined unit?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, katelynn73
Atmospheric air has a temperature (dry bulb) of 80° f and a wet bulb temperature of 60° f when the barometric pressure is 14.696 psia. determine the specific humidity, grains/lb dry air. a. 11.4 c. 55.8 d. 22.5 b. 44.1
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Anon-pipelined system takes 100ns to process a task. the same task can be processed in a 5-segment p...

Questions in other subjects: