subject
Engineering, 21.11.2019 02:31 isabellecannuli

Goal is to design a 4th - order iir butterworth bpf with center frequency 100 hz and bandwidth 40 hz. 1.choose an appropriate sampling rate (e. g., 300 hz) and determine the sample period.2.pre-warp the center, lower, and upper cutoff frequencies using, 휔휔푝푝=2푇푇tan(푇푇2휔휔)3.create a normalized analog 4th-order butterworth lpf (normalized filter will have cutoff of 1 rad/sec), and apply lp to bp transform, using the prewrapped frequencies in step 3. 4.apply bilinear transform to create a digital filter, 퐻퐻(푧푧). 5.plot frequency response of both bpfs,퐻퐻(푠푠) and 퐻퐻(푧푧).

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, rocio5649
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa. s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
image
Engineering, 04.07.2019 19:10, jennymares
Abarometer contains mercury with a density of 13600 kg/m3. atmospheric conditions are 95.8 kpa and 20 °c at 20 °c, the vapor pressure of the mercury is 0.000173 kpa. the column of mercury will rise to a height of most nearly. select one: a)- 0.38 m b)- 0.82 m c)- 0.48 m d)- 0.72 m
Answers: 1
image
Engineering, 04.07.2019 19:10, 592400014353
For a process taking place in a closed system containing gas, the volume and pressure relationship is pvi-constant. -1.5 bar, the process starts with initial conditions, pi = =0.03 m3 and ends with final volume, v2-0.05 m3 determine the work done by the gas.
Answers: 2
image
Engineering, 04.07.2019 19:10, lexie223
Acircular aluminum shaft mounted in a journal is shown. the symmetric clearance gap between the shaft and journal is filled with sae 10w-30 oil at t 30°c. the shaft is caused to turn by the attached mass and cord. develop and solve a differential equation for the angular speed of the shaft as a function of time.
Answers: 2
You know the right answer?
Goal is to design a 4th - order iir butterworth bpf with center frequency 100 hz and bandwidth 40 hz...

Questions in other subjects:

Konu
Mathematics, 10.12.2020 22:40