subject
Engineering, 13.11.2019 22:31 maddison788

Write a function called checkfactor that takes two arrays of positive numbers, firstnumberrow and secondnumberrow. checkfactor checks if the first entry in firstnumberrow is divisible by the first entry in secondnumberrow, and performs the same operation on the next array elements until all entries have been checked. all the numbers are positive and the number of entries in the arrays are the same. the function should return the identified divisible numbers in two row arrays named firstdivisible and seconddivisible. restrictions: branches or loops should not be used. the code must use the internal mod function. hint: the mod function should be used to determine if two numbers are divisible. ex: for num1 and num2 if mod(num1,num2) is 0, then the two numbers are divisible. ex: firstnumberrow =[5, 7, 8, 6, 3]; secondnumberrow = [7, 7, 2, 3, 5]; [firstdivisible, seconddivisible]=checkfactor(firstn umberrow, secondnumberrow) produces

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, DroctorWellsfan
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
image
Engineering, 04.07.2019 18:20, Doogsterr
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
image
Engineering, 04.07.2019 19:20, horsedoggal1234
Consider airflow over a flat plate of length l = 1.5 m under conditions for which transition occurs at le = 0.9 m based on the critical reynolds number, re, e = 5 x 10. evaluating the thermophysical properties of air at 400 k, determine the air velocity. (hint: use the tables to find the properties of air)
Answers: 3
You know the right answer?
Write a function called checkfactor that takes two arrays of positive numbers, firstnumberrow and se...

Questions in other subjects: