Engineering, 12.11.2019 21:31 breannaasmith1122

An emergency shoring for the construction of the bridge in between train traffic requires to have a temporary 20 feet column without bracing, and the vertical capacity is unknown. use a w14x74 (a992) section with both ends connected with pins. using the aisc-lrfd manual the properties are rx=6.04" and ry=2.48", whereas ag=21.8 in2 . what is the value of pu we can guarantee the railroad our column will resist? remember that they can’t afford to have a derailment or excessive movement with your solution.

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, aliceohern
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
You know the right answer?
An emergency shoring for the construction of the bridge in between train traffic requires to have a...