Engineering, 12.11.2019 07:31 joejoefofana
In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan representing a few rooms totaling 2,500sf. the entire building is 550,000sf. the flooring subcontractor bid the project using the floorplans provided (missing 2,500sf) and signed a contract with the information received. if the scope of the contract states, "provide all flooring in new facility," is this contract enforceable by law? why or why not? 1.
Answers: 2
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
Engineering, 04.07.2019 16:10, TheOriginalMeyah
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
In a bid package given to a flooring sub, the gc accidently forgot to include a floor plan represent...
History, 18.10.2019 23:10
Mathematics, 18.10.2019 23:10
English, 18.10.2019 23:10