After the requirement collection and analysis phase the software project of a database application about a company is described as follows: 1. the company is organized into departments. each department has a name, an unique number, and a particular employee who manages the department. we keep track of the start date when the employee began managing the dept. a dept may have several locations.2. a dept controls a number of projects, each of which has a name, unique number, and single location.3. we store each employee’s name, ssn, address, salary, sex, and dob. an employee is assigned to one dept but may work on several projects, which are not necessary controlled by the same dept. we keep track of the number of hours per week that an employee works for each project. we also keep track of the direct supervisor of each employee.4. we want to keep track of the dependents of each employee for insurance purpose. we keep each dependent’s first name sex, dob, and relationship to the employee. draw the e-r diagram by either dia or ms visio. reference: fundamentals of database system, 3rd ed., by elmasriinstructions: database analysis and design(er diagram)after the requirement collection and analysis phase the software project of a database application about a company is described as follows: 1. the company is organized into departments. each department has a name, an unique number, and a particular employee who manages the department. we keep track of the start date when the employee began managing the dept. a dept may have several locations.2. a dept controls a number of projects, each of which has a name, unique number, and single location.3. we store each employee’s name, ssn, address, salary, sex, and dob. an employee is assigned to one dept but may work on several projects, which are not necessary controlled by the same dept. we keep track of the number of hours per week that an employee works for each project. we also keep track of the direct supervisor of each employee.4. we want to keep track of the dependents of each employee for insurance purpose. we keep each dependent’s first name sex, dob, and relationship to the employee. draw the e-r diagram by either dia or ms visio. reference: fundamentals of database system, 3rd ed., by elmasri

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, niyawilliams23
Asingle-geared blanking press has a stroke of 200 mm and a rated capacity of 320 kn. a cam driven ram is assumed to be capable of delivering the full press load at constant force during the last 15 percent of a constant-velocity stroke. the camshaft has an average speed of 90 rev/min and is geared to the flywheel shaft at a 6: 1 ratio. the total work done is to include an allowance of 16 percent for friction a) estimate the maximum energy fluctuation b) find the rim weight for an effective diameter of 1.2 m and a coefficient of speed fluctuation of 0.10
Answers: 1
image
Engineering, 04.07.2019 18:10, skpdancer1605
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
image
Engineering, 04.07.2019 18:20, rbgrh9465
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1