subject
Engineering, 09.11.2019 03:31 babyduckies37

Assume you have the following jobs to execute with one processor: give the average wait time for this set of processes using the following algorithms. specify the arbitration rule used for each algorithm, if needed. (a) first in first out (b) shortest job next (non-preemptive) (c) shortest remaining time next (pre-emptive) (d) round robin, with a quantum of 7 (e) round robin, with a quantum of 5 plus context switch time of 1

ansver
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 04.07.2019 18:10, heidiburgos1own6c0
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, maustin5323
Athin walled concentric tube exchanger is used to cool engine oil from 160°c to 60°c with water that is available at 25°c acting as a coolant. the oil and water flow rates are each at 2 kg/s, and the diameter of the inner tube is 0.5 m and the corresponding value of the overall heat transfer coefficient is 250 w/m2. oc. how long must the heat exchanger be to accomplish the desired cooling? cpwater=4.187 kj/kg-candcpengine el=2.035 kj/kg·°c, oil . 120]
Answers: 1
You know the right answer?
Assume you have the following jobs to execute with one processor: give the average wait time for th...

Questions in other subjects:

Konu
Mathematics, 26.10.2020 17:00