Consider a proposed offshore wind farm composed of 106 siemens direct drive wind turbines each with a rated capacity of 6.00 mw. each wind turbine has a rotor diameter of 154 meters, an effectiveness of 67.5%, and a generator efficiency of 96.0%. the array efficiency is 80.0%. it is estimated that the wind farm will generate 2500 gwh of electricity annually. each wind turbine requires 400 hours of maintenance annually. the density of air is 1.225 kg/m3.

a. what is the coefficient of performance for the turbine rotor (%)

b. what is the overall efficiency of the proposed wind farm (%)?

c. what is the capacity factor of the proposed wind farm (%)?

d. what is the swept area of the proposed wind turbines (m2)?

e. what is the rated wind speed for the proposed wind turbines (m/s)?

f. what is the availability of the proposed wind turbines (%)?

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, meganwintergirl
Afour cylinder four-stroke in-line engine has a stroke of 160mm, connecting rod length of 150mm, a reciprocating mass of 3kg and its firing order is 1-3-4-2. the spacing between cylinders is 100mm. i. show that the engine is in balance with regard to the primary inertia forces and primary 3. a and secondary inertia couples. li determine the out of balance secondary inertia force ii. propose ways of balancing this out of balance force and discuss the challenges that will arise
Answers: 3
image
Engineering, 04.07.2019 18:10, 0436500
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
image
Engineering, 04.07.2019 18:20, Doogsterr
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
image
Engineering, 04.07.2019 19:10, nani3906
Starting wih an energy balance on a rectangular volume element, derive the one- dimensional transient heat conduction equation for a plane wall with constant thermal conductivity and no heat generation.
Answers: 1
You know the right answer?
Consider a proposed offshore wind farm composed of 106 siemens direct drive wind turbines each with...

Questions in other subjects:

Konu
Mathematics, 03.10.2019 11:50