subject
Engineering, 16.10.2019 20:20 tytybruce2

(uscs units) an ecm operation is used to cut a rectangular-shaped blind hole into a block of copper (valence = 1). the frontal working area of the electrode is 0.750 in by 2.50 in. applied current = 900 a and voltage = 15 volts. (a) if the process is 94% efficient, determine the rate of metal removal. (b) if the electrolyte resistivity = 7.5 ohm-in, determine the working gap. (c) if the gap created at the sides of the rectangular-shaped electrode is equal to the working gap from part (b), determine the area of the rectangular-shaped hole that is created (ignore rounding at corners). (d) how much time is required to cut the blind hole to a depth of 1.00 in.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, margaret1758
If you were designing a bumper for a car, would you prefer it to exhibit elastic or plastic deformation? why? consider the functions of a bumper in both a minor "fender-bender" and a major collision.
Answers: 1
image
Engineering, 04.07.2019 18:10, lillygrl100
For the closed feedwater heater below, feedwater enters state 3 at a pressure of 2000 psia and temperature of 420 °f at a rate of ix10 ibhr. the feedwat extracted steam enters state 1 at a pressure of 1000 psia and enthalpy of 1500 btu/lbm. the extracted er leaves at an enthalpy of 528.7 btu/lbm steam leaves as a saturated liquid. (16) a) determine the mass flow rate of the extraction steam used to heat the feedwater (10) b) determine the terminal temperature difference of the closed feedwater heater
Answers: 3
image
Engineering, 04.07.2019 18:10, ijohnh14
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
You know the right answer?
(uscs units) an ecm operation is used to cut a rectangular-shaped blind hole into a block of copper...

Questions in other subjects:

Konu
Geography, 01.07.2019 19:30