subject
Engineering, 10.10.2019 02:30 Tori122367

*(processes on p-v and t-v diagrams) a system consisting of 1 kg of h2o in a pistoncylinder undergoes a power cycle composed of the following processes: process 1-2: constant – pressure heating at 10 bar from saturated liquid. process 2-3: constant- specific volume cooling to saturated vapor at p3 = 5 bar, t3 = 151.86 o c. process 3-4: isothermal compression (heat also transfers from the system to surroundings). process 4-1: constant – specific volume heating. sketch the cycle on t-v and p-v diagrams. neglecting kinetic and potential energy effects, determine the thermal efficiency

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:20, rocio5649
Amixture of slurry and mud is to be pumped through a horizontal pipe of diameter 500 mm. the fluid behaves as a bingham plastic with a yield stress of 30 pa and viscosity 0.04 pa. s. describe the effects of the shear stress through a transverse section of the pipe by plotting the variation in shear stress and velocity profile: (i) just before the slurry starts to move (ii) as the slurry flows when the pressure gradient is double that in part (i)
Answers: 3
image
Engineering, 04.07.2019 19:10, justkevin1231
Which of the following is the most important advantage of a large field of view? a. allows larger areas to be examined b. relieves eyestrain c. minimizes parallax errors. d. increases precision in proportion to the in- crease in field of view
Answers: 2
image
Engineering, 04.07.2019 19:10, nhester3401
Agas is compressed from vi 0.3 m, p 1 bar to of v2 0.1 m3, p2--3 bar. pressure and volume are related linearly during the process. for the gas, find the work, in kj.
Answers: 2
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
*(processes on p-v and t-v diagrams) a system consisting of 1 kg of h2o in a pistoncylinder undergoe...

Questions in other subjects: