subject
Engineering, 09.10.2019 19:30 tyrique86

At a construction site, there are constant arguments and conflicts amongst workers of different contractors and sub-contractors. the construction manager is unable to bring the situation under control. as a result, there’s a delay in project completion. which skill is the construction manager lacking in? a. communication b. technical c. planning d. interpersonal e. it

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:20, dlr1628
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
image
Engineering, 06.07.2019 03:30, sipstick971
An ammonia compressor has a 5% clearance volume and displacement rate of 80 l/s and pumps against a condensing temperature of 40°c. for two different temperatures of -10°c and 10°c, compute the mass flow rate of refrigerant assuming the clearance volumetric efficiency applies. discharge specific volume corresponding to-10°c and 10°c are 112.5 l/kg and 95 l/kg, respectively.
Answers: 2
You know the right answer?
At a construction site, there are constant arguments and conflicts amongst workers of different cont...

Questions in other subjects:

Konu
Arts, 11.01.2021 20:30
Konu
English, 11.01.2021 20:30