subject
Engineering, 02.10.2019 00:30 krog79

3) a scraper with a 275 hp. diesel engine will be used to excavate and haul earth for a highway project. an evaluation of the job-site conditions indicates the scraper will operate 40 min./hr. for this project it is anticipated that the total cycle time will be 20 min. for a round trip. previous job records show the scraper operated at full power for the 1.5 min. required to fill the bowl of the scraper and at 80% of the rated hp. for the balance of the cycle time. calculate the gallons per hour for fuel consumption of the scraper.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
image
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
You know the right answer?
3) a scraper with a 275 hp. diesel engine will be used to excavate and haul earth for a highway proj...

Questions in other subjects:

Konu
Chemistry, 22.07.2021 06:30
Konu
Mathematics, 22.07.2021 06:30
Konu
Mathematics, 22.07.2021 06:30