Y=ax+b
setup the necessary equations to find the unknown coefficients aand
b such that t...
![subject](/tpl/images/cats/User.png)
Engineering, 13.09.2019 20:30 seanholmes91405
Y=ax+b
setup the necessary equations to find the unknown coefficients aand
b such that the vertical y coordinate of the centroid of thecross
section is 2/3m.
![ansver](/tpl/images/cats/User.png)
Answers: 1
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Other questions on the subject: Engineering
![image](/tpl/images/cats/User.png)
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, alyssabailey7545
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:20, samueltaye
Modern high speed trains do not have perpendicular expansion gaps where rails are joined end-to-end any more they are mostly welded together but what might happen if there was a spell of particularly hot weather that causes inspection of the tracks?
Answers: 1
You know the right answer?
Questions in other subjects:
![Konu](/tpl/images/cats/istoriya.png)
History, 12.10.2019 15:30
![Konu](/tpl/images/cats/fizika.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/istoriya.png)
History, 12.10.2019 15:30
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/mat.png)
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/istoriya.png)
History, 12.10.2019 15:30