subject
Engineering, 30.08.2019 17:20 lekaje2375

Amanual assembly line is being planned for a product whose annual demand = 9 units. a continuously moving conveyor will be used with work units attached. work content time = 55 min. the line will run 50 wk/yr, 5 shifts/wk, and 8 hr/shift. each worker will be assigned to a separate workstation. based on previous experience, assume line efficiency = 0.95, balancing efficiency = 0.93, and repositioning time = 9 sec. determine: a. hourly production rate to meet the demand, b. number of workers and work station required, and c. for comparison, the ideal minimum number of workstations required (theoretical).

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, jadeochoa4466
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
image
Engineering, 06.07.2019 03:10, lwattsstudent
List and describe in sequence the operation process steps for boxf machine?
Answers: 1
image
Engineering, 06.07.2019 03:10, netflixacc0107
Consider two concentric spheres forming an enclosure with diameters of 12 cm and 18 cm the spheres are maintained at uniform temperatures ti-50°c and t2 = 250°c and have emissivities .45 and .8, respectively. determine the net rate of radiation heat transfer between the two spheres per unit surface area.
Answers: 1
You know the right answer?
Amanual assembly line is being planned for a product whose annual demand = 9 units. a continuously m...

Questions in other subjects:

Konu
Social Studies, 07.03.2020 02:50