subject
Engineering, 26.07.2019 17:10 jrff3262

Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer within one year. the manufacturer runs a two ten-hour shifts and each shift includes a 30-minutes lunch break and two ten-minutes breaks. the plant works five days a week and have nine holidays per year. calculate the takt time.

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, johnthienann58
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
image
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
image
Engineering, 04.07.2019 18:20, kodyclancy
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Acertain manufacturer has signed a contract to ship 500,000 units of its product to her customer wit...

Questions in other subjects:

Konu
Mathematics, 22.10.2020 20:01
Konu
World Languages, 22.10.2020 20:01