![subject](/tpl/images/cats/User.png)
Engineering, 20.07.2019 17:10 rachanachannagiri
If 6 men or 8 women can finish a work in 12 days, 9 men and 12 women will finish the work nearly ?
![ansver](/tpl/images/cats/User.png)
Answers: 1
![](/tpl/images/ask_question.png)
![](/tpl/images/ask_question_mob.png)
Other questions on the subject: Engineering
![image](/tpl/images/cats/User.png)
Engineering, 03.07.2019 15:10, EmilySerna
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, ijohnh14
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
![image](/tpl/images/cats/User.png)
Engineering, 04.07.2019 18:10, samanthabutryn
Which one from below is not one of the reasons of planning failures? (clo3) a)-planner is careless. b-planner spend less time in the field but more time on the desk c)-planner is not qualified d)-planner does not have sufficient time to properly plan
Answers: 3
You know the right answer?
If 6 men or 8 women can finish a work in 12 days, 9 men and 12 women will finish the work nearly ?...
Questions in other subjects:
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/istoriya.png)
![Konu](/tpl/images/cats/fizika.png)
![Konu](/tpl/images/cats/en.png)
![Konu](/tpl/images/cats/obshestvoznanie.png)
Social Studies, 28.08.2019 01:30
![Konu](/tpl/images/cats/istoriya.png)
History, 28.08.2019 01:30
![Konu](/tpl/images/cats/mat.png)
Mathematics, 28.08.2019 01:30
![Konu](/tpl/images/cats/en.png)
English, 28.08.2019 01:30
![Konu](/tpl/images/cats/mat.png)
Mathematics, 28.08.2019 01:30