Engineering, 19.07.2019 06:20 jos1319

Your plant has a 400 kw and 520 kva demand and has a power contract which calls for a demand charge based on kva the demand charge is s3.00 per kva per month. a) what is the present power factor? b) what kvar size of capacitors is required to achieve a .95 desired power factor? c) how much will the monthly savings be?

ansver
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 03:10, lauriepdx17
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
image
Engineering, 04.07.2019 18:20, alexis9263
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
image
Engineering, 04.07.2019 18:20, ashleyjaslin
Derive the correction factor formula for conical nozzle i=-(1+ cosa) and calculate the nozzle angle correction factor for a nozzle whose divergence hal-fangle is 13 (hint: assume that all the mass flow originates at the apex of the cone.
Answers: 3
image
Engineering, 04.07.2019 18:20, moneywaydaedae
Air is compressed isentropically from an initial state of 300 k and 101 kpa to a final temperature of 1000 k. determine the final pressure using the following approaches: (a) approximate analysis (using properties at the average temperature) (b) exact analysis
Answers: 1
You know the right answer?
Your plant has a 400 kw and 520 kva demand and has a power contract which calls for a demand charge...