An industrial project has amount of the industrial waste (q) in m'/s, for evaluating the amount of waste an experiment is carried out. estimate the accumulative errors of measuring if the errors of measuring the mass, the length, the time, and the temperature are 0.001, 0.05, 0.005, and 0.01 respectively.
Answers: 2
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
Engineering, 04.07.2019 18:10, sarahgrindstaff123
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2