subject
Engineering, 11.07.2019 01:10 malachitorres813

Adouble acting cylinder is hooked up in a regenerative circuit. the cracking pressure for the relief valv is 1500 psi. the piston area is 45 in3 and the rod area is 10 in3. the pump flow is 20 gpm. find the cylinder speed, load-carrying capacity, and power delivered to the load during the a)-extending stoke and b)-retracting stroke. assume the load equals the cylinder load-carrying capacity.

ansver
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, namira16
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
image
Engineering, 04.07.2019 18:20, dlr1628
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
image
Engineering, 04.07.2019 19:10, kelseiroll9759
Ahelical coil spring has a mean diameter of 50 mm, a wire diameter of 5.5 mm and is wound with a pitch of 10 mm. the spring steel has an ultimate strength of 1250 mpa. find the force needed to compress the spring solid and the wire stress in this condition. state whether the spring will return to its initial length.
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
Adouble acting cylinder is hooked up in a regenerative circuit. the cracking pressure for the relief...

Questions in other subjects:

Konu
Mathematics, 03.06.2021 21:50