subject

What does the value of collateral or down payment affect

ansver
Answers: 1

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 21:00, jarrettashlyn
Write a method so that the main() code below can be replaced by the simpler code that calls method original main(): public class calcmiles { public static void main(string [] args) { double milesperhour; double minutestraveled; double hourstraveled; double milestraveled; milesprhour = scnr. nextdouble(); minutestraveled = scnr. nextdouble(); hourstraveled = minutestraveled / 60.0; milestraveled = hourstraveled * milesperhour; system. out. println("miles: " + milestraveled); } }
Answers: 2
image
Computers and Technology, 22.06.2019 22:10, Metlife
Asequential circuit contains a register of four flip-flops. initially a binary number n (0000 ≤ n ≤ 1100) is stored in the flip-flops. after a single clock pulse is applied to the circuit, the register should contain n + 0011. in other words, the function of the sequential circuit is to add 3 to the contents of a 4-bit register. design and implement this circuit using j-k flip-flops.
Answers: 1
image
Computers and Technology, 23.06.2019 01:40, hanjonez
Writing a modular program in visual c++. i am new to this and not sure what i am missing. i am getting the following error: baddate. cpp: in function ‘int main()’: baddate. cpp: 50: 3: error: ‘else’ without a previous ‘if’elsehere are the instructions and code: writing a modular program in c++in this lab, you add the input and output statements to a partially completed c++ program. when completed, the user should be able to enter a year, a month, and a day. the program then determines if the date is valid. valid years are those that are greater than 0, valid months include the values 1 through 12, and valid days include the values 1 through 31.notice that variables have been declared for you. write the simulated housekeeping() function that contains the prompts and input statements to retrieve a year, a month, and a day from the user. include the output statements in the simulated endofjob() function. the format of the output is as follows: month/day/year is a valid date. ormonth/day/year is an invalid date. execute the program entering the following date: month = 5, day = 32, year = 2014. record the output of this program. execute the program entering the following date: month = 9, day = 21, year = 2002. record the output of this /* program name: baddate. cppfunction: this program determines if a date entered by the user is valid. input: interactiveoutput: valid date is printed or user is alerted that an invalid date was entered*/#include bool validatedate(int, int, int); using namespace std; int main(){// declare variablesint year; int month; int day; const int min_year = 0, min_month = 1, max_month = 12, min_day = 1, max_day = 31; bool validdate = true; // this is the work of the housekeeping() method// get the year, then the month, then the daycout< < "enter the year"< > year; cout< < "enter the month"< > month; cout< < "enter the day"< > day; // this is the work of the detailloop() method// check to be sure date is validif(year < = min_year) // invalid yearvaliddate = false; else if (month < min_month || month > max_month) // invalid monthvaliddate = false; else if (day < min_day || day > max_day) // invalid dayvaliddate = false; // this is the work of the endofjob() method// test to see if date is valid and output date and whether it is valid or notif(validdate == true); {// output statementcout<
Answers: 1
image
Computers and Technology, 23.06.2019 12:00, xojade
Which of these is an example of an integrated presentation? a. a table created in powerpoint b. an image pasted into powerpoint c. a caption created in powerpoint d. an excel chart pasted into powerpoint
Answers: 1
You know the right answer?
What does the value of collateral or down payment affect...

Questions in other subjects:

Konu
Health, 19.02.2020 18:47