subject

While using PERT (Program Evaluation Review Technique) and CPM (Critical Path Method) techniques, activities that are on the critical path are more flexible than those activities which are not on the critical path. a. True
b. False

ansver
Answers: 3

Other questions on the subject: Computers and Technology

image
Computers and Technology, 21.06.2019 21:00, sarah192002
You should hand write your references on your resume.
Answers: 1
image
Computers and Technology, 22.06.2019 18:40, penelopymorales24
Mariah was working on a multimedia presentation that included both video and audio files. the file was huge, and she wanted to send it to her coworker in another office. she needed to reduce the size of the file so that it could be transmitted faster. the utility she used to do this was
Answers: 2
image
Computers and Technology, 23.06.2019 01:30, solikhalifeoy3j1r
In deadlock avoidance using banker’s algorithm, what would be the consequence(s) of: (i) a process declaring its maximum need as maximum possible for each resource. in other words, if a resource a has 5 instances, then each process declares its maximum need as 5. (ii) a process declaring its minimum needs as maximum needs. for example, a process may need 2-5 instances of resource a. but it declares its maximum need as 2.
Answers: 3
image
Computers and Technology, 23.06.2019 04:20, RandomLollipop
Which network media uses different regions of the electromagnetic spectrum to transmit signals through air? uses different regions of the electromagnetic spectrum to transmit signals through air.
Answers: 2
You know the right answer?
While using PERT (Program Evaluation Review Technique) and CPM (Critical Path Method) techniques, ac...

Questions in other subjects:

Konu
Social Studies, 05.02.2020 05:53