subject
Computers and Technology, 02.02.2021 05:50 Ruchen

Assume hosts A and B are each connected to a switch Svia 100-Mbps links. The propagation delay on each link is 25μs. The switch Sis a store-and-forward device and it requires a delay of 35μs to process a packet after is has received the last bit in the packet. Calculate the total time required to transmit 40,000 bits from Ato B in the following scenarios. (The total time is measured from the start of the transmission of the first bit at A, until the last bit is received at B. We always assume that links are bi-directional with the same transmission rate and propagation delay in each direction unless specifically instructed otherwise.)

ansver
Answers: 2

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 12:30, Machuco127
Some of the first computer games were created in the early 1970s by college students experimenting after hours to see what the were capable of doing.
Answers: 3
image
Computers and Technology, 22.06.2019 15:00, nika0001
When designing content as part of your content marketing strategy, what does the "think" stage represent in the "see, think, do, care" framework?
Answers: 3
image
Computers and Technology, 22.06.2019 18:00, jabezslade22
What is the first view you place in your drawing?
Answers: 1
image
Computers and Technology, 22.06.2019 23:30, ansonhunter8891
What are listed in the vertical columns across the top of the event editor? a. file names b. conditions c. check marks d. action types
Answers: 1
You know the right answer?
Assume hosts A and B are each connected to a switch Svia 100-Mbps links. The propagation delay on ea...

Questions in other subjects:

Konu
History, 17.12.2020 21:20
Konu
Mathematics, 17.12.2020 21:20
Konu
Mathematics, 17.12.2020 21:20