Am i cute? Rate me & Free points lol
...
Computers and Technology, 01.12.2020 23:00 DnsMonsteR3462
Am i cute? Rate me & Free points lol
Answers: 1
Computers and Technology, 21.06.2019 23:30, nourmaali
4.11 painting a wall (1) prompt the user to input integers for a wall's height and width. calculate and output the wall's area (integer). note that in this case there is a new line after each prompt. (submit for 1 point). enter wall height (feet): 11 enter wall width (feet): 15 wall area: 165 square feet (2) extend to also calculate and output the amount of paint in gallons needed to paint the wall (floating point). assume a gallon of paint covers 350 square feet. store this value in a variable. output the amount of paint needed using the %f conversion specifier. (submit for 2 points, so 3 points total). enter wall height (feet): 11 enter wall width (feet): 15 wall area: 165 square feet paint needed: 0.471429 gallons (3) extend to also calculate and output the number of 1 gallon cans needed to paint the wall. hint: use a math function to round up to the nearest gallon. (submit for 2 points, so 5 points total). enter wall height (feet): 11 enter wall width (feet): 15 wall area: 165 square feet paint needed: 0.471429 gallons
Answers: 3
Computers and Technology, 22.06.2019 17:40, math31343
Gabe wants to move text from one document to another document. he should copy the text, paste the text, and open the new document highlight the text, select the cut command, move to the new document, make sure the cursor is in the correct location, and select the paste command select the save as command, navigate to the new document, and click save highlight the text, open the new document, and press ctrl and v
Answers: 1
Computers and Technology, 23.06.2019 18:30, DSUDLER5555
Write a program that prints the day number of the year, given the date in the form month-day-year. for example, if the input is 1-1-2006, the day number is 1; if the input is 12-25-2006, the day number is 359. the program should check for a leap year. a year is a leap year if it is divisible by 4, but not divisible by 100. for example, 1992 and 2008 are divisible by 4, but not by 100. a year that is divisible by 100 is a leap year if it is also divisible by 400. for example, 1600 and 2000 are divisible by 400. however, 1800 is not a leap year because 1800 is not divisible by 400.
Answers: 3
Computers and Technology, 23.06.2019 19:30, Felixthecat7186
Anul 2017 tocmai s-a încheiat, suntem trişti deoarece era număr prim, însă avem şi o veste bună, anul 2018 este produs de două numere prime, 2 şi 1009. dorel, un adevărat colecţionar de numere prime, şi-a pus întrebarea: “câte numere dintr-un interval [a, b] se pot scrie ca produs de două numere prime? “.
Answers: 3
Mathematics, 28.01.2021 06:10
Mathematics, 28.01.2021 06:10
Mathematics, 28.01.2021 06:10
Mathematics, 28.01.2021 06:10
History, 28.01.2021 06:10
Business, 28.01.2021 06:10
Mathematics, 28.01.2021 06:10