subject

What is troubleshooting? A) increasing the power source to your computer
B) eliminating any data collision
C) addressing a technical problem
D) protecting your software from viruses

ansver
Answers: 3

Other questions on the subject: Computers and Technology

image
Computers and Technology, 22.06.2019 01:50, divine134
A.) generate scaffolding to create database for your application. develop all the entities identified in assignment #2. add any additional that may be identified later. b.) add data validation rules to the models that are appropriate for your application and data. c.) create links for each scaffold in the header section. part 2: application updates [30 points] a.) add two additional views to the "home" controller you created in assignment #1. b.) the two views should be named as “privacy" and "". c.) link the two newly created views in the footer section. hint: you would need to modify the “home" controller definition and create “privacy. html. erb" and “.html. erb" files in appropriate locations.
Answers: 3
image
Computers and Technology, 22.06.2019 03:30, raytaylorh010801
Write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removedproblems 1.1 write a computer program to calculate the three-phase fault current for a fault at f in figure 1.16, with the network normal, and with one line at a time removed 20 power system relaying from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0+j0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the stub-end fault í• figure 1.16 problem 1.1 system data for figure 1.16 from to positive sequence 0.0+j0.1 0.05j0.15 0.04 j0.2 0.01 jo. i 0.015 + j0.15 0.01 j0.19 0.01 +j0.19 0.03+j0.1 0.0+j0.08 6 6 6 from service. the positive-sequence impedance data are given in the accompanying table. use the commonly made assumption that all prefault resistance values are (1.0 + j 0.0) pu, and neglect all resistance values. calculate the contribution to the fault flowing through the cb b1, and the voltage at that bus. for each calculated case, consider the two possibilities: cb b2 closed or open. the latter is known as the “stub-end” fault.
Answers: 2
image
Computers and Technology, 22.06.2019 06:50, Mordred809
Type the correct answer in the box. spell all words correctly. which view of report creation allows you to customize the report before the database program creates it? creating a report in allows you to customize the report before the database program creates it. pl asap
Answers: 1
image
Computers and Technology, 22.06.2019 10:30, robert7248
You have a large, late-model pick-up truck with a rear seat. the pick-up truck weighs 6,500 pounds. the florida seat belt law
Answers: 1
You know the right answer?
What is troubleshooting? A) increasing the power source to your computer
B) eliminating any d...

Questions in other subjects:

Konu
English, 11.11.2020 21:00